午夜无码区在线观看,日本中文字幕乱码AA高清电影,欧美在线一,久久天天躁狠狠躁夜夜2020一 国产二级一片内射视频插放,国产内射爽爽大片视频社区在线,WWW久久久天天COM,男女全黄做爰视频

Scan code consultation:
0755-2102 2109
Technology
Technology
Current location: Home Technology Ex tech
Requirements for metal wall thickness around blind holes on explosion-proof enclosures

SINO Testing Services

| 2020-07-30|Return

According to Article 11.6 of GB 3836.2-2010, for non penetrationExplosion proofThe screw holes or double headed bolt holes on the shell wall, and the remaining thickness of the explosion-proof shell wall should be at least one-third of the diameter of the bolt or double headed bolt, with a minimum of 3mm.

 

Q: Does the 'remaining thickness' of the explosion-proof shell wall here refer to the thickness below the hole or the thickness around and below the hole?

 

A: The "remaining thickness" of the explosion-proof shell wall here is explained as follows: when the hole is perpendicular to the shell, only the shell wall below the hole has a thickness requirement (3mm or 1/3 diameter, whichever is larger). This explanation is based on the fact that there is no specific material thickness requirement for the explosion-proof shell, so the material around the hole is not restricted. Explosion proof testing should consider most blind holes, such as impact testing and overvoltage testing.




Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號(hào)
Service Hotline
18924609560
點(diǎn)擊這里給我發(fā)消息 1354407946
點(diǎn)擊這里給我發(fā)消息 1354407946